{"id":1,"date":"2022-06-11T13:17:00","date_gmt":"2022-06-11T06:17:00","guid":{"rendered":"https:\/\/demo.crocoblock.com\/findero-new\/?p=1"},"modified":"2023-01-04T15:39:40","modified_gmt":"2023-01-04T08:39:40","slug":"ring-road-no-4-an-urgent-project-for-growth","status":"publish","type":"post","link":"https:\/\/pipd.com.vn\/en\/ring-road-no-4-an-urgent-project-for-growth\/","title":{"rendered":"Ring road No.4 \u2013 an urgent project for growth"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"1\" class=\"elementor elementor-1\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-6daef3be elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"6daef3be\" data-element_type=\"section\" data-settings=\"{&quot;jet_parallax_layout_list&quot;:[]}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-7d4dfd3c\" data-id=\"7d4dfd3c\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-b1fbab7 elementor-widget elementor-widget-text-editor\" data-id=\"b1fbab7\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\n<p><img fetchpriority=\"high\" decoding=\"async\" width=\"850\" height=\"469\" class=\"wp-image-3913\" style=\"width: 850px;\" src=\"https:\/\/pipd.com.vn\/wp-content\/uploads\/2020\/07\/duongvanhdai4hanoi1892022.jpg\" alt=\"\" srcset=\"https:\/\/pipd.com.vn\/wp-content\/uploads\/2020\/07\/duongvanhdai4hanoi1892022.jpg 1195w, https:\/\/pipd.com.vn\/wp-content\/uploads\/2020\/07\/duongvanhdai4hanoi1892022-300x165.jpg 300w, https:\/\/pipd.com.vn\/wp-content\/uploads\/2020\/07\/duongvanhdai4hanoi1892022-1024x565.jpg 1024w, https:\/\/pipd.com.vn\/wp-content\/uploads\/2020\/07\/duongvanhdai4hanoi1892022-768x424.jpg 768w, https:\/\/pipd.com.vn\/wp-content\/uploads\/2020\/07\/duongvanhdai4hanoi1892022-600x331.jpg 600w\" sizes=\"(max-width: 850px) 100vw, 850px\" \/><\/p>\n\n\n\n<p>The project is a transportation corridor and economic engine for the growth of the Red River Delta.<\/p>\n\n\n\n<p>National Assembly deputies in a discussion session on June 10 shared the view on the significance of Ring road No.4, which would open up new development spaces and strengthen provincial linkage for growth.<\/p>\n\n\n\n<p>Once completed, Ring road No.4 with a total length of 112.8 kilometers would connect 14 districts from three northern cities\/provinces, including Hanoi, Hung Yen, and Bac Ninh.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><img decoding=\"async\" src=\"https:\/\/media.hanoitimes.vn\/2022\/6\/11\/1-nguyen-dai-thang-hung-yen.jpeg\" alt=\"\"><a href=\"https:\/\/hanoitimes.vn\/\"><\/a><\/td><\/tr><tr><td>&nbsp;<em>Deputy Nguyen Dai Thang from Hung Yen Province. Source: quochoi.vn<\/em><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Deputy Nguyen Dai Thang from Hung Yen Province noted the project would help realize the country\u2019s road network planning for the 2021-2030 period, with a vision for 2050.<\/p>\n\n\n\n<p>\u201cThe project not only enhances economic competitiveness of Hanoi and other cities\/provinces in the capital area but also holds significant meaning in terms of politics and culture,\u201d Thang said.<\/p>\n\n\n\n<p>&#8220;Improving provincial links between Hanoi and other cities is the right step to ensure equitable socio-economic development in the region,&#8221; he continued, hoping the highway offers greater access to industrial parks and urban areas in Hanoi&#8217;s neighboring provinces and cities.<\/p>\n\n\n\n<p>\u201cFrom this starting point, there would be a broad economic corridor linking cities from highlands to delta regions,\u201d Thang said.<\/p>\n\n\n\n<p>Deputy Ta Dinh Thi from Hanoi noted the project is essential in realizing the role of Hanoi as a driving force for growth in the northern region, especially as it would spur the development of more residential areas, industrial parks, and universities in the surrounding areas.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><img decoding=\"async\" src=\"https:\/\/media.hanoitimes.vn\/2022\/6\/11\/5-ta-dinh-thi-ha-noi.jpeg\" alt=\"\"><a href=\"https:\/\/hanoitimes.vn\/\"><\/a><\/td><\/tr><tr><td>&nbsp;<em>Deputy Ta Dinh Thi from Hanoi.<\/em><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Deputy Nguyen Anh Tri from Hanoi, however, called for the Government to adopt the best technical specifications for the construction of the project so that its lifespan would be around 100 years.<\/p>\n\n\n\n<p>Deputy Hoang Van Cuong from Hanoi expected a special mechanism for using land funds alongside the project.<\/p>\n\n\n\n<p>&#8220;These are the enormous resources for the development of the region, which without a proper plan would be wasted,&#8221; he said.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><img decoding=\"async\" src=\"https:\/\/media.hanoitimes.vn\/2022\/6\/11\/133033-ky-hop-thu-ba-quoc-hoi-khoa-xv-quoc-hoi-thao-luan-ve-chu-truong-dau-tu-cac-du-an-giao-thong-trong-diem.jpeg\" alt=\"\"><a href=\"https:\/\/hanoitimes.vn\/\"><\/a><\/td><\/tr><tr><td>&nbsp;<em>Minister of Planning and Investment Nguyen Chi Dung at the session. Source: VNA<\/em><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Determined for highest quality&nbsp;<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><img decoding=\"async\" src=\"https:\/\/media.hanoitimes.vn\/2022\/8\/22\/vanhdai4.jpeg\" alt=\"\"><a href=\"https:\/\/hanoitimes.vn\/\"><\/a><\/td><\/tr><tr><td><em>&nbsp;Ring-road No.4 (red line), designed to run through the Hanoi capital zone, begins in Soc Son District in the northern part of Hanoi and ends in the northern city of Bac Ninh. <\/em><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>At the session, Minister of Planning and Investment Nguyen Chi Dung suggested that Ring road No.4 in Hanoi and Ring road No.3 in Ho Chi Minh City would help address bottlenecks in planning for transport infrastructure in major cities.<\/p>\n\n\n\n<p>According to Dung, infrastructure has long been seen as one of the critical strategic breakthroughs for Vietnam\u2019s development, and the Government is, therefore, determined to build the two ring roads with the highest quality.<\/p>\n\n\n\n<p>Under the Government\u2019s proposal, Ring road No.4 is designed with a total length of 112.8 kilometers, running through Hanoi (58.2 kilometers), Hung Yen (19.3 kilometers), and Bac Ninh (25.6 kilometers).<\/p>\n\n\n\n<p>The project with an area of 1,341 hectares, which would cost a total of VND85.8 trillion ($3.7 billion) from the state budget and investors\u2019 capital, is set to be completed by 2027.<\/p>\n\n\n\n<p>The Government expects the project to be divided into seven sub-components, for which the construction and site clearance phases are conducted separately by the provincial\/city authorities with finance from the combination of public investment and public-private partnership (PPP).<\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>The project is a transportation corridor and economic engine for the growth of the Red River Delta. National Assembly deputies in a discussion session on June 10 shared the view on the significance of Ring road No.4, which would open up new development spaces and strengthen provincial linkage for growth. Once completed, Ring road No.4 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1","post","type-post","status-publish","format-standard","hentry","category-public-infrastructure"],"_links":{"self":[{"href":"https:\/\/pipd.com.vn\/en\/wp-json\/wp\/v2\/posts\/1","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pipd.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pipd.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pipd.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pipd.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1"}],"version-history":[{"count":21,"href":"https:\/\/pipd.com.vn\/en\/wp-json\/wp\/v2\/posts\/1\/revisions"}],"predecessor-version":[{"id":4769,"href":"https:\/\/pipd.com.vn\/en\/wp-json\/wp\/v2\/posts\/1\/revisions\/4769"}],"wp:attachment":[{"href":"https:\/\/pipd.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pipd.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pipd.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}